Everything you need to run the system — inverter, battery bank, solar panels (for solar tiers), all cabling, conduit, circuit breakers, earthing, a monitoring device, and professional installation. There are no hidden add-ons.
No recurring fees. The system is yours outright. You may eventually need maintenance (cleaning panels, checking terminals) but we cover this during the warranty period at no charge.
We require full payment before installation begins. We do not currently offer financing, but this is something we are looking into. Contact us to discuss your situation.
We use Grade-A LiFePO₄ battery cells, properly rated inverters, and correctly sized cables throughout. Cut-price installations typically use underrated components that fail early. Our systems are designed to last ten years — that has a cost.
Start with our Load Calculator or System Simulator to get an idea, then request a consultation. We will ask about your actual appliances, your property, and your grid situation before recommending anything. We do not guess.
Yes, within limits. Our battery banks are modular, so you can add capacity later. Inverter upgrades are possible but require more work. The better approach is to size correctly from the start — we can help you do that.
You can have either. Backup Systems (battery + inverter only) charge from the grid when NEPA is available. Solar Systems add panels to generate power and charge the battery even when the grid is down. Both are legitimate options depending on your situation.
Yes, from the Plus tier and above. A 1.5 HP split AC draws approximately 1,200 W. We size the inverter and battery to handle it, including the surge at startup.
Yes. Borehole pumps have a high starting surge — typically 2–3× running wattage. We account for this in the design. Pro and Elite tiers handle boreholes comfortably.
Our primary installation area is Abuja FCT. If you are outside the FCT, reach out — we assess requests case by case and will be honest about whether we can serve you well.
We can supply equipment only — system, batteries, panels — without installation. Contact us to discuss. You would need to arrange a qualified installer in your location.
A typical residential installation takes one to two days depending on system size and the complexity of your property. Larger systems (Pro and Elite) may take three days. We do not rush jobs.
Someone responsible for the property should be present. We will walk you through the completed system at handover and make sure you understand how to use and monitor it.
Yes, with conditions. We need roof or balcony access for panels and the ability to route cables safely within the building. We assess this during consultation.
Grade-A LiFePO₄ (Lithium Iron Phosphate). This chemistry is inherently stable — it does not catch fire or explode under fault conditions. It lasts significantly longer than lead-acid and handles deep discharge without damage.
LiFePO₄ cells are rated for 8,000+ charge cycles. At one cycle per day, that is over 20 years. In practice, most batteries remain above 80% capacity after 10 years. We back this with a 10-year warranty.
If the battery capacity falls below 80% within 10 years under normal use, we replace it. This covers manufacturing defects and premature degradation. It does not cover physical damage or misuse.
Any installation defect — incorrect wiring, loose connections, faulty earthing, undersized breakers — discovered within 12 months is fixed at no charge. We also cover inverter faults within this period.
We use high-efficiency monocrystalline panels rated between 500–700 Wp per panel depending on the tier. We do not list brand names on this site, but we will show you the datasheets during consultation.
Each panel occupies roughly 2 m². The Essential tier (2 panels) needs about 4 m². The Elite (28 panels) needs approximately 56 m². Most Nigerian residential roofs can accommodate up to the Pro tier comfortably.
Panels still produce power on cloudy days — typically 20–50% of their rated output. The battery stores the excess from sunny periods. The system is designed with a buffer to handle several overcast days.
We install on concrete rooftops, corrugated iron, and standing-seam roofs. We assess your roof during consultation and design the mounting accordingly.
Fill in the consultation form or send us a WhatsApp message. We will respond within one business day, ask a few questions, and send you a proposal. No commitment required at that stage.
Typically two to three weeks. This includes the proposal, equipment procurement, and scheduling. We do not overbook — when we schedule your installation, it happens.
For larger systems (Plus and above), yes. We visit the property, assess the roof, check the existing electrical setup, and confirm the design before sending a final quote.
Hi! I'm the SteadyPower assistant. I can help you figure out the right system for your home or business. What are you looking to power?